To more accurately estimate the cost for a project of any kind, the American Society of Professional Estimators has made a five-tier bid estimation based on a five-tier system that you can adapt to your next construction project.
Level 1: Length order:
The length setting determines the overall feasibility of a construction project before the design phase begins. This is mainly based on the expert opinion and established costs of similar old projects. Specific threshold level -25 to 75 acc accuracy.
Level 2: Bid Estimation of schematic design:
The main purpose of schematic design estimates is to determine the feasibility of the project. Large-scale and commercial projects prepare such estimates to decide whether to carry out or abandon the project.
Level 3: Design development estimates:
This estimate applies a moderately detailed scope to combine the predicted unit cost.
Level 4: Estimation of Construction Document:
This bid estimation is based on construction drawings and descriptions used for the overall project process.
Level 5: Estimation of Bids:
This estimate has been prepared by the contractor, based on the construction documents provided by the owner.
A straightforward method of classifying estimates features only three basic categories: design, bid, and control estimates:
Design estimate:
Prepared during the construction pre-design and design phase, these estimates include the order of magnetite level, schematic design level, and design development level. In addition, design development estimates use engineer bid estimation and construction documentation.
Estimating the bid:
Bid estimation presents the bid of a project. It includes a number of data, such as construction documents, direct costs and other tech offices. With these data points, the estimator presents the cost of the project along with other necessary paperwork to get the job done.
Control the estimate:
Finally, the estimate is made after the contractor’s contract is established, and construction begins. It acts as a baseline through which the actual costs of a project are estimated and controlled.
2 main components of construction cost estimation:
There are many ways to calculate the cost of a construction project, but strong and experienced estimators will classify it into two main components. Direct and indirect costs.
Direct costs are costs and expenses that are directly allocated to a particular activity in the construction process. The following are some examples of guidance costs.
- Content
- Labor
- Equipment
Indirect costs are costs for items that are not directly related to the construction work. Here are some examples of indirect costs.
Administrative cost
- Acquisition of land
- permission
- Design fee
- Temporary site utilities
- Being active
- Security cost
- Quality control
Legal fees
Key vaccines:
Failure to produce a reliable and accurate cost estimate can have disastrous consequences.
Bid estimation construction costs are important in the role of project management, and companies need to invest in technology resources and technology to make this aspect more accurate and efficient. It is important to know the basics of guessing at this initial stage that a project can be made or broken. To make your business a success. The final estimate is what you need to bid.